At least for a few weeks. Thursday a bunch of guys came to my house and tore out my kitchen. It’s down to the studs now. The remodeling will take 4 to 6 weeks.
I’ve said before that my house and I are both in our early 50s and we both need work. The kitchen had become critical. Some of the cabinets were start to literally fall apart and one oven gave up the ghost a couple of months ago.
I’d planned on cooking on my Big Green Egg and I probably will. But first I have to solve two problems. Every horizontal surface in my house is currently stacked with boxes. I have no room to prepare anything.
The other problem is where am I going to wash the dishes? I don’t want to wash my dishes in the bath tub and all my bathroom sinks are too small to scrub pans.
I’ll probably have to get a couple of tubs and do it campground style.
Oh well. In 6 weeks, I’m going to be making some amazing food.